Skip to content
Smoku eG Konrad Smoczynski

Permit dossier / Erkelenz

Cover sheet Smoku eG Ingenieurbüro Konrad Smoczynski

Building permit, Erkelenz, Heinsberg district

Building permit applications for Erkelenz, from the first drawing to submission

A building permit application rarely fails because of the project and often because of the dossier. We plan, draw, calculate and assemble the documents so that the building authority can start checking rather than start asking.

Clipped sets of plans stacked on a work table, a dimensioned floor plan on the top sheet
Fig. 00 Cover sheet of the dossier
Project
New build, extension, conversion, change of use
Location
Erkelenz and the Heinsberg district
Documents
Drawings, building description, certificates
Authorisation
Building documents NRW, V3693

Documents

Sheet 01 of 08

Erkelenz

What the dossier has to contain

These are the documents that building authorities in North Rhine-Westphalia usually ask for. Which of them your project actually needs is something we settle in the first conversation.

  • 01 Application form The official form of the building authority, filled in completely and signed. Part of the dossier
  • 02 Official site plan From the land registry office or a surveyor, with boundaries, distances and levels. Part of the dossier
  • 03 Building drawings Floor plans, sections and elevations at the required scale, dimensioned and labelled. Part of the dossier
  • 04 Building description Construction, materials and fittings in the form the application requires. Part of the dossier
  • 05 Areas and volume Floor areas and gross volume, the figures the authority bases its fee on. Part of the dossier
  • 06 Structural safety certificate The structural design of the project with a position plan and a verifiable calculation. Part of the dossier
  • 07 Thermal insulation certificate The calculated proof for the building envelope and the building services. Part of the dossier
  • 08 Drainage plan Foul water and rainwater up to the connection with the public system. Part of the dossier
  • 09 Parking certificate The number and position of the parking spaces required on the plot. Part of the dossier

Special buildings, sites outside built up areas and changes of use call for further documents. We tell you in advance which ones.

Stages

Sheet 02 of 08

Erkelenz

From the first line to the submitted application

Six stages, in this order. At every point you know what is happening and what is needed from you next.

  1. Stage 01

    First conversation and basics

    We settle the project, the plot and the timing, look at the planning law that applies and say whether a preliminary enquiry is worth it.

  2. Stage 02

    Design and coordination

    The design takes shape as a floor plan, a section and an elevation. Changes are still quick and cheap at this stage.

  3. Stage 03

    Drawings and building description

    The design becomes the formal submission: drawings at the required scale, the building description, areas and volume.

  4. Stage 04

    Certificates

    Structural safety and thermal insulation are calculated and added to the dossier as verifiable documents.

  5. Stage 05

    Dossier and submission

    Everything is checked for completeness, signed and submitted to the responsible building authority.

  6. Stage 06

    Queries and decision

    If anything is queried we answer it and file the additions, until the authority issues its decision.

Services

Sheet 03 of 08

Erkelenz

What the office takes on

Planning, drawing and certificates come from one office, so the documents agree with each other instead of contradicting each other.

  • Service 01

    Planning

    Detached and apartment buildings, from the first design to the finished submission documents.

  • Service 02

    Application documents

    Drawings, building description, calculations and forms, assembled in full.

  • Service 03

    Preliminary enquiry

    Settles the decisive questions about a plot before the full application is prepared.

  • Service 04

    Structural safety

    Structural calculations and working drawings, for the certificate and later for the site.

  • Service 05

    Thermal insulation

    The certificate for the building envelope, matched to the building services planned.

  • Service 06

    Surveying the existing

    Measuring and digitising existing buildings when drawings are missing or no longer correct.

Photographs

Sheet 04 of 08

Erkelenz

Photographs for the stages

Six photographs for stages 01 to 06, so that what the documents talk about becomes visible.

  • First conversation Stage 01
  • Design Stage 02
  • Building drawing Stage 03
  • Certificates Stage 04
  • Dossier Stage 05
  • Start on site Stage 06

The photographs show typical documents and building states. They illustrate the services described.

Authorisation

Sheet 05 of 08

Erkelenz

Who signs the application

A building permit application needs a signature the authority accepts. This one is registered and carries its numbers.

Board member

Konrad Smoczynski, M. Sc. RWTH

Degree
Master of Science RWTH, civil engineering, 2012
Chamber of Engineers NRW
Member since 2017, membership number 730097
Qualified structural designer
Since 2019, authorisation number QT1542
Building document authorisation NRW
Since 2019, authorisation number V3693
Professional indemnity
VHV Allgemeine Versicherung AG, Dortmund

Enquiry

Sheet 06 of 08

Erkelenz

Enquiry about a building permit application

Three details are enough for a call back: your name, a phone number and a few sentences about the project. Everything else we settle in conversation.

About your project Smoku eG

Required

Required

Optional Optional, if you would rather have a written reply.

Optional

Optional

Required

Address
Leichweg 3, 41849 Wassenberg
Main website
ks-ingenieur.de
Call back
On working days, usually the same day.

The enquiry commits you to nothing. We tell you which documents are needed and what they would cost.

Region

Sheet 07 of 08

Erkelenz

Erkelenz and the places around it

The office sits in Wassenberg, barely half an hour from Erkelenz. We submit applications for the town of Erkelenz and for the municipalities of the Heinsberg district.

Town
Erkelenz
District
Kreis Heinsberg
Office
Leichweg 3, 41849 Wassenberg

Places we submit for

  • Erkelenz
  • Lövenich
  • Katzem
  • Kückhoven
  • Golkrath
  • Gerderath
  • Granterath
  • Hetzerath
  • Holzweiler
  • Keyenberg
  • Wegberg
  • Hückelhoven
  • Wassenberg
  • Heinsberg
  • Titz
  • Jüchen

A large part of the projects so far come from Erkelenz: detached houses, semi detached houses and terraced houses.

Questions

Sheet 08 of 08

Erkelenz

Common questions about the application

What clients in Erkelenz most often want to know before they commission the work.

Does my project need a building permit at all?

That depends on size, use and location. Some work needs no permit, some runs through the simplified procedure, some needs the full application. Describe the project and we will place it.

How long does it take until the documents are ready?

The work in the office can be planned, the review at the authority only in part. We give you a realistic frame at the start and tell you early if anything shifts.

What does a building permit application cost?

The fee for planning and certificates follows the HOAI scale and depends on the scope. The authority charges its own fee on top. You get an offer with the scope of work beforehand.

What do you need from me?

Ideally the proof of ownership with the parcel number, a current site plan and your ideas for the building. If something is missing, we tell you where to get it.

Do you also do the structural design?

Yes. The structural safety certificate and the working drawings are produced in the same office, so drawing and calculation agree.

Is a preliminary enquiry worth it?

If the planning law on the plot is unclear, almost always. It settles the decisive question before the full application is worked out.

Do you stay involved once building starts?

On request we take on site management or site supervision in building construction and structural engineering.

Legal notice

Information under section 5 of the German Digital Services Act

Smoku eG Ingenieurbüro Konrad Smoczynski

Leichweg 3

41849 Wassenberg

Deutschland

Represented by

Vorstand: Konrad Smoczynski

M. Sc. RWTH Konrad Smoczynski, civil engineer

Contact

Phone: +49 2432 907 93 00

Email: info@ks-ingenieur.de

Website: https://ks-ingenieur.de

Responsible for editorial content

M. Sc. RWTH Konrad Smoczynski

Leichweg 3, 41849 Wassenberg

Professional title and professional regulations

Professional title: civil engineer, awarded in the Federal Republic of Germany

Qualified structural designer, authorisation number QT1542

Authorised to submit building documents in North Rhine-Westphalia, authorisation number V3693

The German engineering acts, the professional code and the HOAI fee scale apply.

Supervisory authority

Ingenieurkammer Bau NRW

Zollhof 2, 40221 Düsseldorf

Membership number: 730097

Professional indemnity insurance

VHV Allgemeine Versicherung AG

Westfalendamm 223, 44141 Dortmund

Geographical scope of cover: Deutschland

VAT identification number

VAT identification number under section 27 a of the German VAT Act: DE455004862

Dispute resolution

We are neither willing nor obliged to take part in dispute resolution proceedings before a consumer arbitration board.

Liability for content and links

The content of this page was compiled with care. We cannot guarantee that it is accurate, complete or up to date.

The operators of linked pages are responsible for their content. No infringements were apparent at the time of linking.

Privacy notice

Controller

M. Sc. RWTH Konrad Smoczynski, Smoku eG Ingenieurbüro Konrad Smoczynski, Leichweg 3, 41849 Wassenberg

Phone: +49 2432 907 93 00. Email: info@ks-ingenieur.de

Opening this page

This page consists of static files. When you open it, your browser transmits technically necessary data to the server, including the IP address, the time, the file requested and the browser identifier. This data is processed to deliver the page and to keep it secure. The legal basis is Article 6(1)(f) GDPR.

Enquiry form

When you submit the form, your name, phone number, optionally your email address and the details of your project are sent to the Olumax platform, which operates this page technically and forwards the enquiry to us. We process the details solely in order to answer your enquiry. The legal basis is Article 6(1)(b) and (f) GDPR.

The details are deleted as soon as they are no longer needed for that purpose and no statutory retention period stands in the way.

Cookies

This page sets exactly one cookie, named site_lang. It stores the language you selected and expires after one year. It is strictly necessary under section 25(2)(2) TDDDG. There is no analytics and no advertising.

When the start page is opened, the stored value is read. If it holds en, pl or ru, you are taken once to the page in that language. If it holds de, an unknown value or nothing at all, you stay on the German page. The language pages never redirect, they only write their own code into the cookie when they open.

No third parties

There are no analytics services, no advertising networks, no fonts from external servers and no embedded content from other providers.

Your rights

You have the right to information, correction, deletion, restriction of processing, data portability and objection. Please contact info@ks-ingenieur.de.

You may also complain to a data protection authority, in North Rhine-Westphalia the State Commissioner for Data Protection and Freedom of Information.

Cookie information

This page sets exactly one cookie, and only because the language choice would not work without it.

site_lang

Name: site_lang. Purpose: remember the language you selected. Lifetime: one year. Path: the whole site. SameSite: Lax.

The start page reads this value. With en, pl or ru you are taken once to the page in that language; with de, with an unknown value and with no cookie at all you stay on the German page. Every language page writes its own code when it opens and never redirects.

A notice rather than a gate

A cookie that only stores a choice you made yourself is strictly necessary. Under section 25(2)(2) TDDDG it needs no consent. That is why you get a notice rather than a dialogue that blocks the page.

Deleting it

You can delete the cookie in your browser at any time. Without a cookie the start page shows the German version. You can choose your language at any time in the language selector at the top of the page.